[ br ] all ancillary operations not specifically listed and all pre - requisites associated with good construction practice by an experienced contractor shall be deemed to be included in the scope of the work and shad not subsequently be itemized and measured or priced separately either by way of additional items or by direct reimbursement ( such as day - work ) 没有具体列出的所有辅助工作,以及一个有经验承包商的良好施工所需的所有必要条件都应视为包括在工程范围之内,并且不应在以后通过增加项目或直接偿还(如日-工)而单独列出、计量或定价。
2.
All ancillary operations not specifically listed and all pre - requisites associated with good construction practice by an experienced contractor shall be deemed to be included in the scope of the work and shad not subsequently be itemized and measured or priced separately either by way of additional items or by direct reimbursement ( such as day - work ) 没有具体列出的所有辅助工作,以及一个有经验承包商的良好施工所需的所有必要条件都应视为包括在工程范围之内,并且不应在以后通过增加项目或直接偿还(如日-工)而单独列出、计量或定价。